Lab Capacity & Unit Economics Sheet

Below is an Investor- and Operator-Grade LAB CAPACITY & UNIT ECONOMICS SHEET for
Crown Organogenesis Protocols Inc. (COPI).
This is designed for financial models, IC review, and data-room scrutiny, and aligns directly with your Pilot Programand Go / No-Go Matrix.


LAB CAPACITY & UNIT ECONOMICS SHEET

Crown Organogenesis Protocols Inc.

OrgaGen™ Technologies Platform


1. Purpose of This Sheet

To transparently define:

  • Production capacity by lab module
  • Cost structure per plantlet
  • Unit economics at pilot vs scale
  • Margin logic for investors
  • Capital efficiency of biological scaling

2. Lab Production Architecture

Modular Lab Design

COPI operates on a modular, species-segmented lab system.

Each Lab Module includes:

  • Culture initiation room
  • Multiplication & shoot proliferation
  • Rooting room
  • Acclimatization & QA
  • Biosecurity isolation

Design principle: Scale volume without cross-contamination or genetic drift.


3. Production Capacity (Indicative)

Per Lab Module Capacity

ParameterValue
Monthly culture cycles1
Avg multiplication factor4–6×
Monthly plantlets output8,000–12,000
Annual output96,000–144,000
Species per module1–2 (segmented)

Phase-Based Capacity

PhaseTotal ModulesAnnual Output
Pilot Phase1–2120k–250k
Early Commercial4–6500k–750k
Scale Phase10+1.2M–1.5M

4. Cost Structure per Plantlet (Pilot Phase)

Direct Costs

Cost ComponentPHP / Plantlet
Media & reagents35–45
Culture consumables20–25
Labor (lab)40–50
Energy & utilities10–15
QA & biosecurity10–15

Subtotal (Lab): ₱115–150


Downstream Costs

ComponentPHP / Plantlet
Acclimatization20–30
Nursery hardening25–40
Loss allowance (5–10%)10–20
Traceability & QC5–10

Subtotal (Downstream): ₱60–100


Total Pilot Cost per Plantlet

₱175 – ₱250


5. Cost Reduction at Scale

Economies of Scale Drivers

  • Media bulk procurement
  • Labor learning curve
  • Higher survival rates
  • Lower rejection ratios
  • Energy efficiency

Scale Cost Target

PhaseCost / Plantlet
Pilot₱175–250
Early Commercial₱130–170
Scale₱95–130

6. Pricing Framework (Indicative)

Pricing reflects biological performance premium, not commodity seedlings.

Market SegmentPrice / Plantlet (PHP)
Institutional agroforestry₱350–500
Investor-backed plantations₱450–650
High-value perfumery crops₱600–900
Contract growing (bulk)₱300–400

7. Gross Margin Logic

Pilot Phase

MetricValue
Avg selling price₱500
Avg cost₱220
Gross margin56%

Scale Phase Target

MetricValue
Avg selling price₱450
Avg cost₱110
Gross margin75%+

8. Capital Expenditure (Per Module)

ItemPHP
Lab build-out & fit-out2.5–3.5M
Equipment & sterilization1.5–2.0M
Climate control0.8–1.2M
QA & biosecurity0.5–0.8M

CapEx per module: ₱5.3–7.5M


9. Capital Efficiency

MetricValue
Annual output / module120k+
CapEx per annual plantlet₱45–60
Payback period18–30 months
ROIC (steady state)High

10. Sensitivity Analysis (Key Levers)

LeverImpact
Survival +5%+3–5% margin
Media cost –10%+2% margin
Labor efficiency +15%+5–7% margin
Pricing powerStrong (quality-driven)

11. Risk Factors & Controls

RiskControl
Cost overrunsModular scaling
ContaminationSegmented labs
Price compressionPerformance differentiation
Demand volatilityMulti-species portfolio

12. Investor Interpretation

This is a biologically scalable, capital-efficient platform where margins improve with discipline, not speculation.

COPI’s unit economics are driven by:

  • High survival rates
  • Reduced field failure
  • Premium positioning
  • Regenerative, multi-cycle value

13. Strategic Role in the Investment Story

This sheet:

  • Anchors valuation assumptions
  • De-risks scale-up capital
  • Supports board-level approvals
  • Aligns biology with returns

Recommended next documents:

  1. Pilot Economics Snapshot (Tree → Hectare → ROI)
  2. Investor Data Room Index (Complete)
  3. Board-Level Scale-Up Resolution
  4. Species-Specific Unit Economics Sheets

If you want, I can convert this into an Excel-ready tableone-page investor slide, or DENR-aligned annex next.